Featured projects

High-consequence steel delivery with engineered control.

These projects show how CH Steel converts scale, risk, and multi-party complexity into controlled delivery outcomes across commercial, civic, and infrastructure environments.

01 Commercial Bay

Project 01

Commercial Bay

8,500 tonnesStructural steel package delivered
39 StoreysTower scale in central Auckland
A NZ FirstHeight and complexity milestone

Commercial Bay demonstrates CH Steel's integrated model in a constrained Auckland CBD environment: approximately 8,500T of structural steel, a 39-storey tower, welded braced perimeter frame, steel lift cores, and advanced erection sequencing ahead of concrete floor plates.

Client: Fletcher Construction

Constructability-led planning Constrained urban logistics Quality & safety control
02 NZICC

Project 02

NZ International Convention Centre

8,500 tonnesHerrick fabricated package
NZ-ScaleLargest columns and trusses in country context

NZICC brought Herrick and Culham Engineering together through CH Steel for a major fabricated steel package, including some of New Zealand's largest columns and trusses, delivered through tightly coordinated urban sequencing.

Client: Fletcher Construction

High-interface coordination Complex transfer structures Staged delivery sequencing Programme-critical execution
03 Madden Street

Project 03

Madden Street

1,585 tonnesStructural steel package
AlignedTrade and temporary works interface planning
ReliablePredictable delivery rhythm in constrained access

Madden Street combined mixed-use structural requirements with tight programme coordination in a fast-moving central Auckland development zone.

Client: LT McGuinness

Urban mixed-use delivery Interface-first detailing Quality-controlled installation
04 Westfield

Project 04

Westfield

4,500 tonnesStructural steel package
PreciseTight tolerances through fabrication and install
ControlledDisciplined risk management at each handover

Westfield required high-volume steel packages to integrate with active retail and public-access interfaces while maintaining certainty across programme milestones.

Client: Scentre Group

Live-environment constraints Night & off-peak logistics Public interface management Construction-stage certainty
05 Auckland Transport Hub

Project 05

Auckland Transport Hub

1,200 tonnesHerrick fabricated package
IntegratedCross-discipline civil and structural planning

Auckland Transport Hub demanded infrastructure-grade sequencing, possession-window precision, and dependable coordination across multiple delivery interfaces.

Client: ICON

Infrastructure-grade control Possession-window delivery High-consequence staging

Partner project depth

Partner delivery highlights.

CH Steel combines Culham's New Zealand heavy-engineering capability with Herrick's international structural-steel depth. One company, owned 50/50 by Culham Engineering and The Herrick Corporation, carrying each package from start to finish.

Herrick

The Salesforce Tower San Francisco, USA
SoFi Stadium Inglewood, USA
181 Fremont San Francisco, USA

Culham

IKEA Auckland Auckland, New Zealand
Bowen Campus Redevelopment Wellington, New Zealand
Whangārei Civic Centre Whangārei, New Zealand

Next step

Discuss project constraints.

Engage CH Steel early to test sequencing, cost, interfaces and execution control before the package is locked.