Capabilities
Capacity planned into the job
How planning, detailing, fabrication, coatings, logistics and erection connect.
Control points
Capability, coordinated into delivery
Scope, access, lifting, programme and steel strategy tested before the package hardens.
Fabrication-ready information aligned with release sequence and site needs.
Material flow, fit-up, welding, inspection and records controlled through the workshop.
Protective systems planned before handling, dispatch and installation reduce site rework.
Loads sequenced to the site, not just shipped when steel is complete.
Access, cranes, safety and installation sequence connected to the upstream plan.
Protective coatings
Coatings planned in, not bolted on
Protective coatings are part of CH Steel's end-to-end service: specified and sequenced from the start.
Planning the coating system before handling, dispatch and installation protects durability, avoids rework on site and keeps the steel performing for the life of the asset.
Coatings scope
- Coating system matched to environment and durability requirements
- Surface preparation and application controlled to specification
- Sequenced with fabrication, transport and lifting to avoid damage
- Inspection and records carried through to site handover
Workshop to site
Proof across the delivery path
Fabrication, coatings, logistics and site delivery shown as connected stages of the same steel package.
Talk early
Planning a steel package?
Every control point above is cheapest to set before fabrication starts. Bring CH Steel in early.